SAP Landscape Management 3.0, Enterprise Edition

Configuring HA/DR Provider Hook (Update)

You want to update parameters that are relevant for the hook such as changing the timeout while writing the replication status.

Prerequisites

Procedure

  1. Choose Operations .
  2. Choose Systems from the tabs.
  3. From the Operations dropdown for the primary master node, choose Start of the navigation pathSAP HANA Replication Next navigation step Configure HA/DR Provider Hook (Update)End of the navigation path.
  4. Enter the interval for the file system check in seconds.

    Ensure that the interval for the file system check is smaller than the accepted age of the replication status.

  5. Optional: Change the default installation directory of the HA/DR provider scripts.

    The default directory should be available on all nodes of a scale-out cluster. Ensure that the scripts are installed and available on all nodes in this directory.

  6. Optional: To stop processing on the primary instance if the replication status share is not available and replication is no longer in sync, set Strict Handling to True. This enables you to avoid data loss.

    You can then no longer write on the primary instance.

  7. Optional: To update an existing configuration, set Update Configuration to True.
  8. Optional: Enter the timeout while writing to the replication status share.

    This is the maximum amount of time the primary instance will wait for the hook in case of a stale NFS share.

  9. Optional: Select the Set Note checkbox and enter a note to be displayed in the Description column of the instance.
  10. Choose Execute.