Follow-Up Actions After Status Change You can define follow-up actions for each status change for force elements and their assignments. The follow-up actions are triggered when the status in question is changed.
Certain predefined follow-up actions are shipped with the standard system. You can also define your own follow-up actions.
You are familiar with the follow-up actions provided. They are stored in table /ISDFPS/CSTASUC (view / ISDFPS/VSTASUC ). This table also contains further information about the follow-up modules.
In Customizing for
Defense Forces & Public Security
, you can define you own follow-up actions for status changes by choosing
.
The following follow-up actions are shipped with the standard system:
Object/Assignment |
Follow-Up Action |
Description |
|---|---|---|
Force Element |
/ISDFPS/CL_STACHG_FORCE_PR_WF |
Workflow notification via Force Provider Switch |
/ISDFPS/CL_STACHG_LES_INFO |
LES reorganization: Send info to LES If an LES or a loading object is affected by the reorganization of a force element, an IDoc is sent to the affected LES at a fixed point in time to provide information about the upcoming reorganization. |
|
/ISDFPS/CL_STACHG_MM_MAT_CR |
||
/ISDFPS/CL_STACHG_TRANSFER_STO |
LES reorganization: Post stock from loading objects When a force element is activated (following reorganization), the stock from the loading objects is posted to the new LES. Posting takes place in MM Stock. The storage bins are transferred to the target LES together with the stock, and posted using a report. |
|
/ISDFPS/CL_STACHG_WERK_CHG_BEL |
||
/ISDFPS/CL_STACHG_WERK_CHG_MAT |
||
/ISDFPS/CL_STACHG_WERK_CHG_WF |
Cross-Plant Reorganization (Organizational Structure): Workflow for Storage Location Entry |
|
/ISDFPS/CL_STACHG_WERK_CHG_E |
Cross-Plant Reorganization (Operation): Workflow for Storage Location Entry |
|
/ISDFPS/CL_STAFUP_AC_ASSET_01 |
||
/ISDFPS/CL_STAFUP_AC_CCTR_01 |
||
/ISDFPS/CL_STAFUP_AC_CCTR_02 |
||
/ISDFPS/CL_STAFUP_AC_PRCTR_09 |
||
/ISDFPS/CL_STAFUP_AC_CCTR_03 |
||
/ISDFPS/CL_STAFUP_AC_CCTR_04 |
||
/ISDFPS/CL_STAFUP_AC_CCTR_05 |
||
/ISDFPS/CL_STAFUP_AC_CCTR_06 |
||
/ISDFPS/CL_STAFUP_AC_CCTR_07 |
||
/ISDFPS/CL_STAFUP_AC_CCTR_08 |
||
/ISDFPS/CL_STAFUP_AC_FUND_01 |
||
/ISDFPS/CL_STAFUP_BAS_SYSADM |
||
/ISDFPS/CL_STAFUP_MM_OR_DELI |
Delimits the support relationships for the force element in accordance with its end date ( explosion ) |
|
/ISDFPS/CL_STAFUP_OF_FORCERDEL |
Delimits the assignment of authorized materials, logistical requirements, and reportable item codes to the force element in accordance with its end date ( explosion ) |
|
/ISDFPS/CL_STAFUP_RE_ADJ_CON |
||
/ISDFPS/CL_STASUC_MM_PRIO_TRANS |
||
Authorized Personnel |
/ISDFPS/CL_STAFUP_OF_FORCERDEL |
Delimits the assignment of authorized materials, logistical requirements, and reportable item codes to the force element in accordance with its end date ( explosion ) |
/ISDFPS/CL_STAFUP_ME_TRIGG_WF |
Can trigger a workflow when changes are made to an infotype 1959 record. |
|
Logistical Requirements |
/ISDFPS/CL_STACHG_MM_MAT_CR |
|
Materials Management |
/ISDFPS/CL_STACHG_MM_MAT_CR |
|
Authorized Material |
/ISDFPS/CL_STACHG_MM_MAT_CR |
|
Infrastructure - Contract |
/ISDFPS/CL_STAFUP_RE_COYADR |
|
Task Organization |
/ISDFPS/CL_STACHG_LES_INFO |
LES reorganization: Send info to LES (see above) |
/ISDFPS/CL_STACHG_TRANSFER_STO |
LES reorganization: Post stock from loading objects (see above) |
|
All |
/ISDFPS/CL_RM_STATUS_FOLLOW_UP |
The status changes possible here correspond to those of the measure areas ; the objects and assignments concerned correspond to the measure subareas of the organizational measure .
Note
The system still executes the follow-up actions even if you have deactivated the organizational measure functions.
For Materials Management, see Adjustment Following Organizational Change .
For information about assigning authorizations, see User and Role Administration .