Show TOC

 Dispersal of a Force Element

Use

You disperse an active force element when the organizational unit it represents no longer exists in your organization as of a specific point in time.

Features

You can disperse either an individual force element or, starting from a force element, a (sub)structure. In both cases, the system triggers or carries out the following actions automatically:

  • The force element is delimited.

  • If the entire structure is delimited, the lower-level force elements are also delimited.

  • The relationships between the force elements involved are delimited.

  • The relationships with positions (authorized personnel) are delimited. In the human resources management system, the relationships with the person can then be adjusted accordingly.

  • The checks and follow-up actions defined in Customizing are triggered, for example:

    • Delimitation of the authorized materials, logistical requirements, and assigned reportable item codes

    • Delimitation of the support relationships and therefore trigger of the workflows for changed support relationships

    • Delimitation of the cost centers

    • Cost center lock for postings

Activities

You are in edit mode in the Structures Workbench and, if required, have chosen an organizational measure .

Dispersal of an individual force element
  1. Load the force element that you want to disperse.

  2. To disperse an individual force element, choose the Name tab page.

  3. Choose Create.

  4. In the Planning Status field, select Planned .

    The Delimit Date field is displayed.

  5. Enter the required valid to date for the force element.

  6. Save your entries.

  7. Change the status until the force element is activated.

Dispersal of a structure
  1. Choose the highest-level force element in the (sub)structure that you want to disperse.

  2. In the structure area, choose the function Start of the navigation path Structure Operations Next navigation step Delimit Force Element End of the navigation path .

    Caution Caution

    If you confirm the subsequent confirmation prompt, the delimitation is carried out immediately, if you are not using an organizational measure. If you are using an organizational measure, the delimitation is made in the status Planned.

    End of the caution.
  3. Enter the required valid to date for the force element.

  4. Choose Delimit.

    The delimitation is carried out.