POD Pushbutton Activities 
The following tables describe activities that are associated with pushbuttons on the predefined PODs.
Note
Some activities have rules that allow you to change the way they behave. For more information, see field help for individual activities.
POD Pushbutton Activity |
Activity ID |
Description |
|---|---|---|
Start |
PR500 |
Starts the selected SFC numbers at the entered operation and resource, and displays them as selected in the Active Work list. Validates that the selected resource is in a current state to process product and is not in the Pending status (see Start). |
Start |
PR505 |
Starts the SFC numbers associated with the entered material at the entered operation and resource, and displays them as selected in the Start by Material Task list. Used for high-volume environments (see Start by Material) |
Complete |
PR510 |
Completes the SFC numbers selected in the Active Work list and sends them to the next step on the routing. Resets the selected resource from Productive to the new Pending status when the last active SFC number is completed from the resource (see Complete).
If you complete an SFC number that belongs to a process lot, you must remove it from the process lot first. The POD displays a message stating this. Choose the Complete pushbutton to remove the SFC number from the process lot and send it to the next operation on the routing. End of the note. |
Pass |
PR510Q |
Performs a Start and then a Complete transactions (see Pass) |
Sign Off |
PR520 |
Removes selected SFC numbers from the Active Work list and returns them to the Task list with the In Queue status. Resets the resource from Productive to the new Pending status when the last active SFC number is removed from the resource (see Sign Off). |
Data Collection |
DC500 |
Displays additional fields in which the operator can enter information, such as room temperature or the thickness of a sample (see Data Collection (DC))
When setting up a POD with DC500, sequence it after Start (PR500) and before Complete (PR510). End of the note. |
Assembly Point |
CT500 |
Collects assembly data for a selected SFC number at selected operations for components to be assembled (see Assembly Point) |
Process Lot |
PR560 |
Allows the operator to create process lots, and to add SFC numbers to a process lot and remove them from it (see Process Lot) |
Serialize |
PR550 |
Creates new SFC numbers for a multipiece parent SFC number, such as a panel that the operator has broken apart (see Serialize) |
Work Instruction Viewer |
WI500 |
Allows the operator to view work instructions You must set up work instructions in the system before users can view them (see Work Instruction Viewer). |
SFC Report |
TR500 |
Displays information about the selected SFC numbers (see SFC Report) |
Log NC |
NC500 |
Allows the operator to log nonconformance codes against one or more selected SFC numbers (see Log NC and NC Client Maintenance) |
Pack/Unpack |
PK030 |
Allows the operator to add or remove SFC numbers or containers to or from a specific container (see Packing) |
SFC Merge |
PR581 |
Allows the operator to combine SFC numbers (see SFC Merge) |
SFC Quantity Adjustment |
PR591 |
Allows the operator to increase or decrease the quantity of an SFC number (see SFC Quantity Adjustment) |
SFC Split |
PR571 |
Allows the operator to move quantity from an existing SFC number into new SFC numbers (see SFC Split) |
Change User Password |
EN066 |
Allows the operator to change the current password (see Change User Password) Appears dimmed when the LDAP service is enabled |
Confirm Components |
CONFIRM_COMPONENT |
Allows the operator to confirm that components assembled into a kit SFC number are the same components that are assembled on the top-level SFC number and have the same assembly data (see Component Confirmation and Check Confirm) |
Shop Floor Change Request |
SU620 |
Allows the operator to request production changes on the shop floor (see Shop Floor Change Request) |
Display Buyoff |
DISPLAY_BUYOFF |
Allows the operator to display a buyoff (see Display and Log Buyoff) |
Log Buyoff |
LOG_BUYOFF |
Allows the operator to log a buyoff (see Display and Log Buyoff) |
Document Reprint |
SY511 |
Allows the operator to reprint documents (see Document Reprint) |
Unload CNC Program |
UNLOAD_CNC_PLUGIN |
Unloads a CNC/DNC program from the CNC server to the machine via the CNC system in the POD (see CNC Program Maintenance) |
Change SFC Labor Charge Code |
LT250 |
Changes the labor charge code of one or more SFC numbers
You cannot change the SFC LCCs of SFC numbers if you enter a shop order number in the SFC field in the POD. You must enter a process lot number or select multiple SFC numbers. End of the note. |
Simplified Log Primary NC |
NC515 |
Configures the Fast Barcode Interface (see Configuring Fast Barcode Interface) |
ECO Processing |
SU610 |
Executes the engineering change order (ECO) process for a selected SFC number at the selected operation (see Engineering Change Order (ECO)) You can change the following settings for the ADJ_ORIG_SO_ BUILD_QTY_DOWN rule for this activity: TRUE (default): Adjusts the original shop order build quantity down to the number of SFC numbers affected by the ECO once the ECO is activated FALSE: Does not adjust the original shop order build quantity down when the ECO is activated |
Transfer Work |
LT390 |
Signs off the active SFC numbers from the primary operator's Active Work list and transfers them to the Active Work list of the other operator who has been labored on |
POD Pushbutton Activity |
Activity ID |
Description |
|---|---|---|
Start |
PR500_RICH |
Starts a selected SFC number at selected operation to indicate that the SFC number is being actively worked on the shop floor |
Complete |
PR510_RICH |
Completes a selected SFC number at selected operation to indicate that the SFC number has completed processing and is ready to be worked at the next operation
If other users are currently working on the same operation of an SFC number, the Rich POD displays a message stating this and lets you choose whether to labor them off and complete the SFC number, or to cancel completing the SFC number. Choose OK to labor off the other users and complete the SFC number. End of the note. |
Sign Off |
PR520_RICH |
Places a selected SFC number at selected operations to indicate that the SFC number is no longer being actively worked on the shop floor
If other users are currently working on the same operation of an SFC number, the Rich POD displays a message stating this and lets you choose whether to labor them off and remove the SFC numbers from the Work List or to cancel laboring them off. Choose OK to labor off the other users. End of the note. |
Data Collection List |
DC500_RICH |
Collects process data for a selected SFC number at selected operations (see Rich POD Data Collection) |
Component List |
CT500_RICH |
Allows the operator to record information about the components consumed in an assembly in the Rich POD |
Log NC |
LOGNC_REJECT |
Logs primary NC codes for a selected SFC number at selected operations to indicate that additional work must be performed at the same operation and to automatically reopen all previously closed buyoffs (see Rich POD Log NC Reject) |
Buyoff Accept |
BUYOFF_ACCEPT |
Performs buyoff of a selected SFC number at selected operations to indicate that the user has completed processing and the SFC number can be approved by another user or is ready to be worked at the next operation (see Buyoff Accept) |
Labor On |
LT370_RICH |
Logs the user as joining one or more operators working on an SFC number at the same operations in the Rich POD |
Labor Off |
LT380_RICH |
Allows the user working with one or more operators on an SFC number to unlog working on the operations for the SFC number in the Rich POD The SFC number remains in work until it is completed or signed off by the last operator. |
WI List |
WI510_RICH |
Displays the list of work instructions in the Rich POD (see Work Instruction and Work Instruction Viewer) |
Tool List |
TOOL_DISPLAY |
Displays the list of tools in the Rich POD (see Rich POD Tool Display) |
Supervisor Work Assignment |
PR610_RICH |
Allows the supervisor to assign operations to be performed on an SFC number to the available operators within the work center in the Rich POD (see Rich Supervisor Work Assignment) |
Rich POD Collect Parent Serial Number |
PR555_RICH |
Collects the parent serial number of the parent production order for a selected installation order SFC number (see Collect Parent Serial Number) |