Entering content frameProcess documentation Report Editing Locate the document in its SAP Library structure

Purpose

See Report Management.

Note

Reports without references to a specification do not appear in report management, but are handled as released reports after the assignment of a generation variant to the report template and appear directly in the report information system.

Prerequisites

Example

A user with authorization for the rating PUBLIC can only display entries that originated from generation variants rated as PUBLIC only.

    1. Edit value assignments including usage and active indicator in specification management (see Specification Editing).
    2. You have created the report template (see Document Template Editing).
    3. Define the layout of the report template and release it (see Document Template Layout Editing).
    4. Create a generation variant, enter the usage for it, and assign the appropriate report template to it (see Generation Variant Editing).

Process Flow

  1. In the specification management hit list, you can generate a test report from a report template that contains specification symbols to test the layout and print the report as required. The report template must have the status Released or In work.

Report templates are linked to the usage via generation variants.

  1. You first create a report for a specification, a generation variant, and a language by creating a report request manually in specification management. The SAP System replaces the symbols that relate to specification data or phrases. The parameters that relate to other data in the SAP System are determined at the time the final report is generated.
  1. You can use the SAP System to generate a worklist for reports in which changes have been made subsequently to phrase or specification data. The SAP System automatically subsequently generates all reports affected and sets the reports to the initial status you defined in the generation variant header.

The system places manually created report requests in the worklist automatically.

You can monitor generation using the WWI monitor.

  1. In report management, the reports are displayed in the report tree. The worklist is edited depending on the status of a report.

When generated, the report has the initial status you defined in the generation variant header. You use the initial status and the indicator for the generation variant to determine if a report:

  1. You can use the following additional functions in report management:

Result

Starting from the report information system, you can ship and export released reports.

See also:

Search and Data Output in the Report Information System

Report Export: Process

Report Shipping: Process

 

 

Leaving content frame