Report Editing See Report Management .
Note
Reports without references to a specification do not appear in
report management
, but are handled as released reports after the assignment of a generation variant to the report template and appear directly in the
report information system
.
You must have the appropriate authority to edit reports in
report management
:
Example
A user with authorization for the rating
PUBLIC
can only display entries that originated from generation variants rated as
PUBLIC
only.
You have installed the current version of Windows Wordprocessor Integration (WWI).
Before you can generate reports from report templates, you must have done the following:
You have edited the identifiers and value assignments, including usage and active indicator, in
specification management
(see
Specification Editing
).
You have created the report template (see Document Template Editing ).
You have defined the layout of the report template and released it (see Document Template Layout Editing ).
You have created a generation variant, entered the usage for it, and assigned the appropriate report template (see Generation Variant Editing ).
To display inbound reports , you have installed on your front end an application that can output the format of the inbound reports.
To generate a worklist, you have edited the
Worklist
section in Customizing for
Product Safety
.
In the
hit list for specifications
, you can generate a
test
report
from a
report template
that contains specification symbols to
test the layout
and print the report as required. The report template must have the status
Released
or
In Work
.
Report templates are linked to the usage via generation variants .
You first create a report for a specification, a generation variant, and a language by
creating a report request manually
in
specification management
. The SAP system replaces the symbols that relate to specification data or phrases. The parameters that relate to other data in the SAP system are determined when the
final report
is generated.
You can use the SAP system to generate a worklist for reports in which changes have been made subsequently to phrase or specification data. The SAP system subsequently generates all reports affected and sets the reports to the initial status you defined in the generation variant header.
The system places manually created report requests in the worklist.
You can monitor generation using the WWI monitor .
In
report management
, the reports are displayed in the
report tree
. The
worklist is edited
depending on the status of a report.
When generated, the report has the initial status you defined in the generation variant header. You use the initial status and the generation variant indicators to determine the following:
Does the report need to be generated manually as it was created manually
Does the report have to pass through different control points in release
Does the report have to be included in versioning
Is the status of the report set to
Historical
automatically if a new report is generated subsequently and released
You can use the following additional functions in
report management
:
From the report tree, you can display reports as Microsoft Word documents. The SAP system determines
default values
for report symbols of type
Parameter
. You can
overwrite
these values.
The assignment of specifications enables you to assign several specifications to one report (n:m relationship between specification and report).
You can compare the currently released report with the previous version.
Starting from the
report information system
, you can ship and export released reports.
See also: