Report Management Worklist

Use

TheSAPsystem determines all manually and automatically generated report requests when generating the worklist.

Report requests are generated automatically

If specification data or phrases are changed and are already used in reports (with status GS, R1, R2,..., CO, or RE) so that the existing reports must be updated

Here, the system also takes into account included document templates , that is, it is irrelevant whether the symbols for the changed specification data or phrases are in the template for the report affected or in a template that is directly or indirectly included in the template for the report affected.

If a report for a specification, generation variant, and language is to be sent because of an automatically generated report shipping order and theSAPsystem cannot select a released report

For manual report shipping, you must generate the report request manually.

Prerequisites

Worklists can be generated manually or scheduled automatically (see Generating Worklists ).

For more information about setting up a worklist, see under Worklist in Customizing for Product Safety .

Features

TheSAPsystem takes into account only released report templates.

TheSAPsystem determines the changes to specifications and phrases as follows:

Changes to Specifications

TheSAPsystem determines all specifications whose data was modified in the relevant time frame.

When determining the other specifications in which a changed specification is used, theSAPsystem checks the following areas:

Reference relationships

Inheritance relationships

Listings and compositions

Transport classifications

TheSAPsystem determines all report bodies that refer to the changed specifications.

Reports are checked to determine if the changes made to the specification data is relevant to them. Only these reports enter the worklist as newly generated reports.

Changes to Phrases

TheSAPsystem makes changes to phrase data as follows:

The system determines all phrases that were changed in the relevant time frame.

If a phrase status is specified for the phrase, the system checks whether the PhSymExpan (Expansion of Phrase Symbol in Report ) indicator is set for the status in theIMGactivity Specify Phrase Status . If it is, the phrase is taken into account, otherwise it is not taken into account.

Reports in which the phrases were originally created as phrase symbols enter the worklist immediately as newly generated reports.

The system then determines the specifications in which the changed phrases are used.

All reports that refer to these specifications are then selected.

The system checks the reports to determine whether the changed phrase data is relevant to them. Only these reports enter the worklist as newly generated reports.

Creating Worklists

The time frame for which changes are determined is specified by the date of the last worklist generation and the current date minus one day. Because time frames for which a worklist has already been generated are logged, there can be no time gaps. This ensures that no changes are overlooked. Changes in the future are only taken into account when they become valid.

TheSAPsystem automatically subsequently generates all reports affected and sets the reports to the initial status you defined in the generation variant header. See Generation Variant Indicators .