Performance-based Completion Confirmations from Production 

Purpose

This step demonstrates how completion confirmations for a production order can influence maintenance measures performed on production resources and tools.

This example has been created for a bottling/canning plant. Here, tins are filled with paint. The bottling/canning plant contains a filter press which is recorded as PRT equipment in the task list for material Y-351.

The maintenance plan for the PRT equipment contains three performance related maintenance cycles. This means that every time the PRT equipment above is used, different operations are used for the scheduled maintenance plan. In cases of high use this may lead to a change of filter.

Process Flow

You can find the data for this process under .

  1. Maintenance Plan – Scheduling Display
  2. Creating a Production Order
  3. Confirming the Production Order
  4. Displaying the Measurement Document
  5. Monitoring Deadlines for the Maintenance Plan
  6. Displaying Maintenance Plan Scheduling
  7. Changing the Order
  8. Assigning Materials in the Maintenance Order
  9. Releasing the Maintenance Order and Printing Shop Papers
  10. Issuing Materials (Optional)
  11. Displaying the Withdrawal Quantity
  12. Time Confirmation
  13. Technically Completing the Order
  14. Settling the Order
  15. Closing the Order