Task Tasks are elementary physical operations or movements created from requests and executed by resources .
Tasks contain required information to move materials or perform operations on materials.
A task can either be assigned to a resource selecting the task, or manually assigned to a resource by the warehouse manager.
After being assigned a task, resources can do one of the following:
Execute and then confirm the task
Force confirm the task. Refer to Force Confirming Tasks .
Skip the task. Refer to Skipping Tasks .
Note
You define the activities of tasks in Customizing for
There are several relationships between tasks and requests:
One request to one task
One request to several tasks
Several requests to one task
Several requests to several tasks

A request involves putaway of a full pallet from the receiving area into a rack storage location. This could be performed by a simple forklift and thus a single move task is created.

A request involves putaway of a pallet from the receiving staging area into high-bay storage location. This requires two different resource types, each performing a physical step:
Move pallet from the empty pallet zoneto a intermediate P&D , using a pallet jack
Move pallet from P&D to the high-bay storage, using a turret truck
Thus two tasks are created.

Several requests are created for several putaway items for a mixed pallet needing to be taken to a storage bin. Since each putaway item needs to be taken to the same storage bin, a single movement task is created.

Several delivery items need to be picked, packed and then moved from the picking area to the shipping staging area. The following tasks are created:
Separate picking tasks for each delivery item
A packing operation task
A movement task