Introduction

The Installation Checklists are intended as a protocol that helps you to summarize the installation process and record the installation results.

For this purpose, enter the relevant information into the appropriate blanks.

In this way, in case of difficulties the checklists can serve as an aid to identify the causes of problems and thus help to provide possible solutions quickly and effectively.

Note:
Note that this document is not intended to replace the corresponding Installation Guides for each application but to offer additional support. You should have thoroughly worked through the documents Master Architecture Guide - Cross Application and the Master Installation Guide – Cross Application to understand which applications are necessary for your solution.

The Installation Checklists are divided into the following sections:

Basic Information

The Basic Information section is intended to take essential information for the framework conditions of the installation process.

In detail, the Basic Information section should provide the following information:

Topic Information
The topic for which information should be provided (e.g. installed application, version, and contact persons). This column is intended for your use: Enter the appropriate information.

Technical Data

The Technical Data section is prepared to take technical information on configuration settings made during the installation process.

In detail, the Technical Data section should provide the following information:

No. Step Technical Data
Unique step number The step for which information on technical data should be provided. This column is intended for your use: Enter the appropriate information.

Steps

The Steps section lists all steps required for a successful application installation. Each step contains a short instruction as well as a reference to a more detailed description in the corresponding Installation Guide.

In detail, the Steps section provides the following information:

No. Step Reference Req. Done
A unique step number. The step to perform. Reference to the detailed description in the documentation. An indication whether the step is required. This column is intended for your use: Mark a step as done