What's New in SAP Integrated Business Planning for Supply Chain 2005
What's New in SAP Integrated Business Planning for Supply Chain 2005
Content
What's New in SAP Integrated Business Planning for Supply Chain 2005
How to Use the What's New Table
Identity and Access Management
How to Lock Unused Business Users
Administration
Manage User Permissions
Communication Scenarios
How to Restart Application Jobs and Chains
Data Integration
Enhancements of Data Extraction Using OData Service
Data Integration Using RFC-Enabled Function Modules
Model Configuration
Normalization
Checks for Stored Key Figures Read from Incompatible Input Planning Levels
Switch to Calculation View
Suppressible Errors Expiring in 2005
Suppressible Errors Expiring in Upcoming SAP IBP Releases
Filter Blocks
Migration of Copy Operators
Enhancements to Copy Operator Profiles
Calculation Improvements for TSPROPERTYCOUNTER Key Figure
Calculation Improvements for ABCXYZCOUNTER Key Figure in Demand Planning
Periodicity Change to Calendar Weeks for Snapshots in Demand Sensing
Closer Alignment of SAP3 and SAPIBP1 Sample Planning Areas
Change of Name and Description of CAPACONSUMPTION Key Figure
Removal of SOURCETYPE Attribute from WKCOMPALTCOMPSRC Planning Level
Adjustments in Sample Planning Operator Names and Descriptions
Introduction of Network Echelon Level Attribute
Introduction of Frozen Window Attributes as Key Figures
Adjustment of PRODUCTIONSOURCEITEMVALIDITY Master Data Type
New App: Multilanguage Support
Focus Mode Available for Planning Levels
Check for Fixing-Enabled Key Figures with a Wrong Generated Key Figure Assignment
Filter Setting and Group-By Setting Fields Removed From Planning Areas App and Sample Model Entities App
Usability Enhancements for the Planning Areas App
IBP Excel Add-In
Decoupling from SAP EPM
Usability Enhancements
Sharing IBP Planning Views with non-SAP IBP Users
Partial-Read Parameters
Simplification of Updating and Deleting Master Data
Web-Based Planning
Enhancements for Planning Notes in the Web-Based Planning App
New Panel for Planning View Settings
Order Information in Planning Views
Frozen Columns in the Planning View
Demand Planning
Usability Enhancements in Manage Product Lifecycle App
Maintenance of Product References and Forecast Dates on an Aggregated Level
Enhancements in Manage Realignments Rules App
Creation Period Filter for Analyze Promotions App
Enhancements in Demand Sensing
Packaging for Lag-based Snapshots
Option to Disregard Zero Values in Lag-Based Snapshots
Periodicity-Based Tagging for Outlier Periods in the Past
Demand Sensing for Product Phase-Out
New Options for Daily Disaggregation
Assignment of Forecast Models Containing Demand Sensing Algorithms
Change Points Considered by Multiple Linear Regression and Auto-ARIMAX/SARIMAX
Change Point Detection Enhanced
Inventory Optimization
Changes to Inventory Global Configuration Parameters
New App: Inventory Profiles
New Setting for Forecast Error Calculations in Inventory Optimization
New Frozen Window Master Data Type Attributes
Changes to Loop Handling
Changes to the IBPPRODUCTIONSOURCEITMVALIDITY Master Data Type
Visibility to Network Topology Echelon Number
Fair-Share Lot Sizes for Non-Stocking Nodes
Demand-Driven Replenishment
Buffer Zone Calculation on a Daily Level
New Parameters for Demand-Driven Replenishment Profile App
DDR Operators Ignore Invalid Leadtime and Variability Category Overrides
Driver-Based Planning
Changed Field Names in the Driver-Based Planning App
Time-Series-Based Supply Planning
Transportation Calendars
Production Calendars
New Additional Parameter in S&OP Operator Profiles App
Finite Heuristic Enhancements
Migration to Normalized Data Model - Effect on Forecast Consumption
Time-Series-Based Supply Propagation Heuristic No Longer Available for New-Installation Customers
Order-Based Planning
Optimization in Deployment Runs
Usability Improvements to Job Templates for OBP Planning Runs
Planning with Component Validities
Enhanced Capabilities to Manually Adjust Quantities
New Planning Level for Customer Dimension
New External Key Figure Quantity for Planning Run Information
Enhanced Rule Maintenance Capabilities (Planning Run Profiles)
New Sort Attributes for Custom Sequences
Segment Details Pop-Up Added
Reading Key Figures Using Period Types
Copy and Paste Feature for Version-Specific Settings
Update Behavior of Planning Calendars
Network Calculation Changes
Enhancement of Veto Checks in the Master Data Deletion Process
Period Settings Button in Order Network Tab
New OpenAPI Versions
Deprecation of OpenAPI Versions
New Help Section: Making Settings for Planning Runs
Usability Improvements to Search
Order Information in Planning Views
New Operator in Filters and Parameters
New and Changed Column Headings in View Demands by Priority App
Changes to Supplier Key Figures
Cross Applications
Planning Calendars
Exception Management
Custom Alerts
End-to-End Visibility
Intelligent Visibility
Analytics
Analytics
Changes to the Supply Chain Network App
Required Master Data Types for Supply Chain Network