Usability Improvements to Job Templates for OBP Planning Runs
We have improved the usability of the application job templates for the OBP planning runs in the following ways:
-
With the introduction of optimization in deployment runs (see Optimization in Deployment Runs), we have made the planning algorithm a new parameter in the affected templates, that is, in the Order-Based Planning: Deployment Run and in the Order-Based Planning: Constrained Forecast Run. In this way, you can use the same job template independent of the algorithm you want to use: finite heuristic or optimizer.
Previously, there was a separate template for the constrained forecast run using the optimizer that had Using Optimizer appended to its name, while the template for the constrained forecast run using the finite heuristic was just called Order-Based Planning: Constrained Forecast Run.
-
We have restructured the Planning Scope section in all OBP planning run templates to accentuate that you can either select the overall network or a subnetwork, and that these selections are mutually exclusive.
Once you've made your initial choice - Network by Location Material Attributes or Subnetwork by Subnetwork ID - the dependent parameters are available for selection.
This change affects the Order-Based Planning: Confirmation Run, the Order-Based Planning: Constrained Forecast Run, and the Order-Based Planning: Deployment Run, as well as the Order-Based Planning: Constrained Forecast Run Using Optimizer, which is in deprecation.
Technical Details
| Types |
Changed Must know |
| Available as of | 2005 |
Effects on Configuration
Your already scheduled jobs and job chains will still work after the upgrade.
If you want to use the newly introduced deployment optimization feature, you need to use the new template and set the new parameter accordingly.