Normalization

A new normalized data model is going to be introduced to improve performance, memory utilization, robustness, and scalability in the upcoming releases.

Technical Details

Types

Must know

Available as of 2002

Effects on Configuration

To be ready for normalization, you have to make sure that your planning model fulfills the following requirements:
  • In calculation definitions, an input planning level where the stored value of a key figure is used must contain the same set of root and non-root attributes as the base planning level.

    For more information, see section Checks for Stored Key Figures Read from Incompatible Input Planning Levels below.

  • Key figures that you marked as input/output for supply planning during model configuration must be valid for the S&OP operator.

  • The number of time series entries that can be created or updated using an attribute as key figure must not exceed the limit of 1 million time series entries per attribute as key figure. This limit was introduced for normalized planning models to help prevent long runtimes of master data loads and high memory consumption. We recommend that you check the configuration and data uploads for your time-dependent attributes as key figures and adapt them to make sure that the allowed maximum data volume for master data creation is not exceeded.

    For more information about the options you have for changing the configuration, see Troubleshooting for Attributes as Key Figures. For more information about the concept of attributes as key figures, see Attributes as Key Figures. This topic also includes an example that shows you how to calculate the number of master data records that you can upload for an attribute as key figure.

In a normalized data model, planning area activation might take more time as objects are created on the level of planning levels.

All planning areas will be migrated to this normalized data model in cooperation with the customers in the upcoming releases.

To find out if a planning area has already been normalized, open the log of an activation that took place after the upgrade to IBP 2005. If the log contains the message Planning area activation is running in a normalized data model., the planning area has already been normalized.

For more information about normalization, see 2885814 Information published on SAP site and 2885767 Information published on SAP site.