New External Key Figure Quantity for Planning Run Information
The new external key figure quantity LAST_PLANNING_RUN is now available on the PERPRODLOC planning level in the STD_MALO data source. This key figure quantity contains data about the type and start date of the last planning run. You can use this quantity if you want to define a calculation for the type of the last planning run for a certain location product.
Note that this key figure quantity is not available in the SAP7 sample planning area. You have to add this key figure quantity to the key figure calculations in your productive planning area before you can use it.
Technical Details
| Types |
New |
| Available as of | 2005 |
Additional Details
In the IBP Excel add-in, numbers are mapped to the planning run type as follows:
- 1: Confirmation run
- 2: Constrained forecast run
- 3: Deployment run
- 4: Constrained forecast run using optimizer
- 5: Confirmation run (multiple forecast key figures, no consumption)
- 6: Constrained forecast run (multiple forecast key figures)
- 7: Deployment run (multiple forecast key figures, no consumption)
- 8: Constrained forecast run using optimizer (multiple forecast key figures)