Function documentation Defining the Variables   Locate the document in its SAP Library structure

Use

For the budget planning in plant maintenance and customer service, you must make some customer-specific BPS variable settings in the planning workbench of the BW-BPS system (SAP Business Information Warehouse). The meaning of the variables is explained in the following table.

Prerequisites

You have defined the Report Groups and Budgeting Groups.

For an overview of the overall settings required, see Customizing for Budget Planning.

Features

The following variables are available in the planning application 4MCBA004:

Variable

Technical name

Description

User category:

0=Planner 1=Manager 2=Both

4MCBV503

Defines the role of the user and determines the functions that are available to the user in the Web UI.

Report number

4MCBV504

Determines whether the user can see the reports in the Web UI.

Budget year

4MCBV001

See comment 1

Budget year

4MCBV501

Leave this variable blank.

Budget category: Ad hoc (Hist.)

4MCBV054

See comment 1

Budget category: Ad hoc (Plan.)

4MCBV047

See comment 1

Budget category: Task list

4MCBV046

See comment 1

Budget category: History-based

4MCBV048

See comment 1

Budget category: Maintenance plan

4MCBV045

See comment 1

Budget use: Ad hoc (Hist.)

4MCBV055

See comment 1

Budget use: Ad hoc (Plan)

4MCBV051

See comment 1

Budget use: Task list

4MCBV050

See comment 1

Budget use: History-based

4MCBV052

See comment 1

Budget use: Maintenance plan

4MCBV049

See comment 1

One

4MCBV101

This variable is already defined.

Equipment: History-based

4MCBV015

Assigns a group of equipment, for which he or she is responsible, to a user in the history-based or zero-based budgeting method. These attributes represent the fields in the equipment master record in the ERP system (for example, cost center, planner group).

See also comment 2

Equipment: Zero-based

4MCBV014

Fiscal year variants 

4MCBV003

See comment 1

Key figure category: Budget specification

4MCBV018

See comment 1

Key figure category: Detailed planning

4MCBV016

See comment 1

Key figure category: Simulated costs

4MCBV017

See comment 1

Copy comment: Budget category

4MCBV103

Leave this variable blank.

Copy comment: Budget use

4MCBV104

Leave this variable blank.

Copy comment: Equipment

4MCBV105

Leave this variable blank.

Copy comment: Comment

4MCBV109

Leave this variable blank.

Copy comment: Comment entry

4MCBV110

Leave this variable blank.

Copy comment: Cost type

4MCBV108

Leave this variable blank.

Copy comment: Cost center

4MCBV107

Leave this variable blank.

Copy comment: Functional location

4MCBV106

Leave this variable blank.

Controlling area

4MCBV004

See comment 1

Cost center

4MCBV005

Assigns all data records with the corresponding cost center to a user. In the process the cost center for each data record is determined using the technical object:

·        If a piece of equipment exists, this cost center is taken.

·        If no piece of equipment exists, but a functional location does exist, the cost center of the functional location is taken.

Planning scenario: Ad hoc (Hist.)

4MCBV053

See comment 1

Planning scenario: Ad hoc (Plan)

4MCBV043

See comment 1

Planning scenario: Task list

4MCBV042

See comment 1

Planning scenario: History-based

4MCBV044

See comment 1

Planning scenario: Maintenance plan

4MCBV041

See comment 1

Copy reference data: From year

4MCBV022

Planning function for planner You can use this function to copy reference data from previous budgeting years into the current version of the budget proposal of the current year.

You use the key figure category to define whether you are copying actual data or budget data from the reference year. You use the version to define the reference version (such as, approved version) from which you are copying.

Copy reference data: From key figure category     

4MCBV025

Copy reference data: From version

4MCBV023

Reference year

4MCBV505

See comment 1

Reference year

4MCBV507

Leave this variable blank.

STS use:

0=No 1=Yes

4MCBV506

Specifies whether the STS (Status and Tracking-System) is used.

If the STS is not used, two pushbuttons are displayed in the Web UI:

·        For the planner: Send for Approval

·        For the manager: Reject Approval

See comment 1

Scenario:

1=Histor. 2=Zero-bas. 3=Both

4MCBV502

Defines the budgeting method for your company:

·        History-based

·        Zero-based

·        Both

The variable controls which scenarios are displayed in the Web UI.

Functional location.: History-based (attribute)

4MCBV029

Assigns a group of functional locations, for which he or she is responsible, to a user in the history-based or zero-based budgeting method. These attributes represent the fields in the master record of the functional location in the ERP system (for example, cost center, planner group).

See also comment 2

Functional location.: Zero-based (attribute)

4MCBV009

Techn. Location.: History-based (Hierarchy)  

4MCBV030

Assigns a group of functional locations, for which he or she is responsible, to a user in the history-based or zero-based budgeting method. This group is determined using the hierarchy for functional locations. However, this determination only works if there is a hierarchy for functional locations in the BW system. By assigning a node to a user, the user is responsible for this node and the subordinate nodes.

Functional location.: Zero-based (Hierarchy)  

4MCBV008

Responsible (superordinate) 

4MCBV063

This variable is dtermined by a function module.

Responsible

4MCBV010

Assigns one node to the user in the hierarchy assignment between managers and planners. You have already defined the hierarchy (see Defining Report Groups and Budgeting Groups).

See comment 3

Responsible

4MCBV013

Responsible (assigned)

4MCBV033

Assigns the users to all the hierarchy nodes directly underneath. The assignment determines the planner's group, to which the manager can send budget proposals and from which the manager can display and reject budget proposals.

See comment 3

Responsible (assigned)

4MCBV034

Version

4MCBV007

See comment 1

Version: Approved   

4MCBV032

See comment 1

Version: Initial

4MCBV011

See comment 1

Version: Internal cost type distribution

4MCBV012

See comment 1

Version: Internal period distribution

4MCBV035

See comment 1

Version: Internal without distribution

4MCBV037

See comment 1

Version: Planning

4MCBV039

See comment 1

Version: Rejected

4MCBV038

See comment 1

Copy version data: From version

4MCBV021

See comment 1

Version: Approved

4MCBV031

See comment 1

Currency

4MCBV006

See comment 1

Surcharge/Discount

4MCBV102

Leave this variable blank.

 

Comment 1:

You define this variable using the Customizing for the Budget Planning.

Comment 2:

See Planning Only For Equipment or Only For Functional Locations

Comment 3:

Example: Planners C1 and C2 are assigned to manager A.

Activities

You can call up the planning workbench in the BW-BPS system under Business Planning and Simulation ® Planning Workbench.

 