Material OverviewOverview of the materials that were selected or costed.
You can display the material overview in accordance with the following:
The
material selection
for a costing run (in the
Costing results
screen area)
The
BOM explosion
for a costing run (in the
Costing results
screen area)
The following information is displayed for each material:
Material and plant
Number of system messages
Costing lot size and unit of measure
Material component indicator
If this indicator is set, the material was included in the cost estimate as a material component (without its own BOM).
If this indicator is not set, the material was included in the cost estimate as an assembly (with its own BOM).
Description of material
If the material has already been costed with a quantity structure or within a costing run, you can go to the cost estimate by double-clicking on the material. For more information, see Analyzing the Results .