Rating After Check A final appraisal of the risk potential of an agent in a work area after the results of the risk assessment have been checked.
When you assign a rating after a check, you formally close a risk assessment. Using the rating, you can document how the risk or hazard is to be assessed following a check of the data and an effectiveness check of the
safety measures
.
You can also specify who is responsible for the check and when the check was made.
If the check provides a negative result, you can create a
follow-on assessment
or specify the date of the next risk assessment.
You set the value assignment after check in the
Val. ass. chckd
field on the
Edit Risk Assessment: Assessment
screen.
The field is only ready for input if there are no more open
safety measures
or no safety measures were entered. No open safety measures means that all safety measures have the status
Task completed
or
Deleted by PM
.
You set the possible ratings in Customizing for
Industrial Hygiene and Safety
under
Specify Exposure Ratings
.
The system assigns a traffic light icon to each
Value Rating Check
to make it clearer. This icon can have the following color settings:
Symbol |
Color |
Meaning |
|---|---|---|
|
Red |
High risk |
|
Yellow |
Medium risk |
|
Green |
No risk |
– |
– |
Not specified or no rating available |
Note
You also set which traffic light icons correspond to the different
Rating After Check
in Customizing for
Industrial Hygiene and Safety
under
Specify Exposure Ratings.
When you search for a risk assessment, you can use the traffic light icon as a search criterion. During the search, both the rating after check and the main rating are taken into account.
After rating, all risk assessment data relevant for the check result is locked for changes. You can still edit any fields that have no influence on the rating. For example, you can add a text note or add the date of the next risk assessment. You can also edit the status. If you do not want to permit any more changes you must set the status to Historical
.
See
Status Editing for Risk Assessment
.
If you run a matchup with the
exposure profile
after assigning the rating, the rating of the corresponding exposure profile entry is overwritten by theRating
After Check
. If you have not filled out the
Rating After Check
, the
Main Rating
is used for the matchup.