Cost Center (Range): Planning - PeriodsTechnical name: 0CCA_C11_Q0070
If you want to modify this query, note the special features of the 0CCA_C11 CO-OM-CCA: Costs and Allocations InfoCube
This query is a regular report for the cost center manager. It provides an overview of the planned costs and plan changes for the selected cost centers or cost element groups in the reporting time frame. The reporting time frame covers all periods of the current fiscal year.
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description |
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
InfoObject |
Description |
0COSTCENTER |
Cost center (variable 0N_CCTR, 0H_CCTR) |
0COSTELEMNT |
Cost element (variable 0N_COEL, 0H_COEL) |
InfoObject |
Description |
Actual previous year |
Actual costs per period in the previous fiscal year |
Plan previous year |
Planned costs per period in the previous fiscal year |
Planned costs for current year |
Planned costs per period in the current fiscal year |
Variance (%) |
Percentage variance between the actual costs of the previous fiscal year and the planned costs of the current fiscal year per period |
Change in Plan (%) |
Difference between the planned costs of the previous and the current fiscal year (percentage) |
InfoObject |
Description |
Periods 1 to 12 (Use of the Period structure) |
Periods 1 to 12 of each fiscal year |
You can go from this query to the next related one.
Query |
Description |
0CCA_11_Q007 |