Show TOC

 Cost Center (Detail): Planning - Periods

Technical name: 0CCA_11_Q007

If you want to modify this query, note the special features of the 0CCA_C11 CO-OM-CCA: Kosten und Verrechnungen InfoCube

Use

This query is a regular report for the cost center manager. It provides an overview of the planned and actual costs from the previous year and the plan changes between that and the current fiscal year for the selected cost center in the reporting time frame.

Note Note

This query is contained in the workbook Cost Center (Detail): Planning – Current Year/Previous Year .

End of the note.

For background information on the concept of queries, see Queries in Controlling .

Filters

InfoObject

Description

0CO_AREA

Controlling area (variable 0P_COAR; single value entry, required)

0CURTYPE

Currency type = (company code currency)

0COSTCENTER

Cost center (variable 0S_CCTR, selection options, optional)

0FISCVARNT

Fiscal year variant 0010 ( SAP-Exitvariable 0P_FVAEX )

Rows

InfoObject

Description

Actual previous year

Actual costs from all periods in the previous fiscal year

Plan previous year

Planned costs from all periods in the previous fiscal year

Planned costs for current year

Planned costs from all periods in the current fiscal year

Change in Plan (%)

Percentage change planned costs previous year compared with current year (plan previous year - plan current year) / plan current year

Variance (%)

Percentage variance between actual and planned costs from previous year (actual - plan) / plan

Columns

InfoObject

Description

Periods one to 12

(Use of the Period structure)

Posting period one to 12