Cost Centers (Range): Plan/Actual - PeriodsTechnical name: 0CCA_C11_Q0062
If you want to modify this query, note the special features of the 0CCA_C11 CO-OM-CCA: Costs and Allocations InfoCube
This query is a regular report for the area manager. It provides a period-specific overview of the actual and plan costs incurred in a cost center range during the current fiscal year. The system determines period-specific variances using the plan and actual values.
Note
This query is contained in the Cost Center (Range): Plan/Actual - Situation workbook
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description |
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
|
0FISCPER |
All periods of the current fiscal year (SAP exit variable 0I_CUFYE) See also
Queries in Controlling
, under the section
|
InfoObject |
Description |
0COSTCENTER |
Cost center (variable 0N_CCTR, 0H_CCTR) |
0COSTELEMNT |
Cost element (variable 0N_COEL, 0H_COEL) |
InfoObject |
Description |
Actual |
Actual Costs |
Plan |
Planned Costs |
Variance (%) |
Percentage variance between actual and planned costs (actual - plan) / plan |
InfoObject |
Description |
Periods 1 to 12 (Use of the Period structure) |
Periods 1 to 12 of each fiscal year |
You can go from this query to the next related one.
Query |
Description |
0CCA_C11_Q004 |