Cost Center (Detail): Actual/Plan - Periods Technical name: 0CCA_C11_Q004
If you want to modify this query, note the special features of the InfoCube 0CCA_C11: CO-OM-CCA: Costs and Allocations .
This query is a regular report for the cost center manager. It provides a period-specific overview of the actual and planned costs incurred on a cost center and the actual credit during the reporting time frame.
Note
This query is contained in the workbook Cost Center (Detail): Plan/Actual - Situation .
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description |
|---|---|
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
|
0FISCYEAR |
Current fiscal year (SAP Exitvariable 0FYEAR) See also
Queries in Controlling
, under the section
|
0COSTCENTER |
Cost center (entry optional, variable 0S_CCTR) |
InfoObject |
Description |
|---|---|
0COSTELEMNT |
InfoObject |
Description |
|---|---|
Actual costs |
Actual costs from all periods in the current fiscal year |
Planned costs |
Planned costs from all periods in the current fiscal year |
Variance (%) |
Percentage variance between actual and planned costs in all periods of the current fiscal year (actual - plan) / plan |
InfoObject |
Description |
|---|---|
Periods 1 to 12 (Use of the Periods structure) |
Periods 1 to 12 of the fiscal year |