Initial Definition of Operational System You can define the operational system of force elements initially using a mass function.
You can carry out a system switch for force elements for which an operational system is defined.
You are in the system you want to define as the operational system for force elements.
Two alternative reports are available for the initial definition of the operational system.
You can use report /ISDFPS/FORCE_LOGSYS_CREATE to define the system you are currently in as the operational system for all force elements that exist in this system and for which an operational system has not yet been specified.
You can use report /ISDFPS/FORCE_LOGSYS_CREATE2 to define the system you are currently in as the operational system for force elements that exist in this system and that you have selected using the generic selection parameters .
If you choose the
Replace
indicator, already existing assignments are overwritten, otherwise they are retained.