Report: Assigned Master Equipment You can use this report to show which master equipment (technical objects) is assigned to a force element. The system evaluates the following assignments:
Owner assignment: active assignment between force element and master equipment using relationship 820.
Utilizer assignment:
You can choose between different views.
You can call this report for the selected force element from the
Structures
Workbench
directly
. For more information, see
Technical Objects
.
When you call the report, you have the following views available:
All assigned master equipment
All assigned master equipment with owner assignment
All assigned master equipment with utilizer assignment
All assigned master equipment with owner assignment for which there is no utilizer assignment for the same force element
All assigned master equipment with utilizer assignment for which there is no owner assignment for the same force element
Choose the
Master Equipment for Force Element
application
(transaction /ISDFPS/PMEQSE1).
Enter the required selection values.
Choose
Execute.
Choose the required view in the
Selection
field.
You can use the
Create Purchase Requisition
pushbutton to initiate a new
utilizer assignment
(see also
Assigning Technical Objects
).