Production: Analysis – Work in Process
Technical name: 0PC_C01_Q0009
If you want to modify this query, note the special features of InfoCube 0PC_C01
Cost Object Controlling.Use
This query enables you to analyze the work in process and reserves for unrealized costs.

This query is contained in the workbook
For background information on the concept of queries, see
Queries in Controlling.
Filters
InfoObject |
Description of the Info Object (and restriction or calculation formula) |
0FISCVARNT |
Fiscal year variant (SAP exit variable
&OP_FVAEX&: the system derives the fiscal year variant from the controlling area) |
0CO_AREA |
Controlling area (variable &OP_COAR) |
0FISCPER |
Fiscal year/period (variable &0I_FPER&) |
0CURTYPE |
Currency type (fixed value 70, currency of controlling area) |
User-Defined Characteristics
InfoObject |
Description |
0PRODORDER |
Order |
0PLANT |
Plant (variable &0S_PLANT&) |
0PRODPROCNR |
Production process |
0MATERIAL |
Material number (variable &0S_MATG&, material group) |
Rows
Row Name |
Description of the Info Object (and restriction or calculation formula) |
0MATERIAL__0PROD_HIER |
Product hierarchy |
Columns
Column Name |
Description of the Info Object (and restriction or calculation formula) |
Reserves for unrealized costs |
Reserves for unrealized costs. For information on reserves for unrealized costs (reserves created during WIP calculation), see also
Work in Process in Product Cost by Order |
WIP: Work in process |
For information on the different types of requirement to capitalize WIP, see also
Work in Process in Product Cost by Order |
Report/Report Interface
Query |
Description |
0PC_C01_Q0023 |
Production: Detail – Order – Work in Process |
You can branch to the report Production: Detail – Work in Process (0PC_C01_Q0023) from the query drilldown level order.