Query Production: Analysis – Work in Process  Locate the document in its SAP Library structure

Technical name: 0PC_C01_Q0009

If you want to modify this query, note the special features of InfoCube 0PC_C01 Cost Object Controlling.

Use

This query enables you to analyze the work in process and reserves for unrealized costs.

Note

This query is contained in the workbook Production: Analysis – Work in Process. Note that in this query, the WIP on the database is shown as a negative value, while in the report it is positive.

For background information on the concept of queries, see Queries in Controlling.

Filters

InfoObject

Description of the Info Object (and restriction or calculation formula)

0FISCVARNT

Fiscal year variant (SAP exit variable &OP_FVAEX&: the system derives the fiscal year variant from the controlling area)

0CO_AREA

Controlling area (variable &OP_COAR)

0FISCPER

Fiscal year/period (variable &0I_FPER&)

0CURTYPE

Currency type (fixed value 70, currency of controlling area)

User-Defined Characteristics

InfoObject

Description

0PRODORDER

Order

0PLANT

Plant (variable &0S_PLANT&)

0PRODPROCNR

Production process

0MATERIAL

Material number (variable &0S_MATG&, material group)

Rows

Row Name

Description of the Info Object (and restriction or calculation formula)

0MATERIAL__0PROD_HIER

Product hierarchy

Columns

Column Name

Description of the Info Object (and restriction or calculation formula)

Reserves for unrealized costs

Reserves for unrealized costs.

For information on reserves for unrealized costs (reserves created during WIP calculation), see also Work in Process in Product Cost by Order

WIP: Work in process

For information on the different types of requirement to capitalize WIP, see also Work in Process in Product Cost by Order

Report/Report Interface

Query

Description

0PC_C01_Q0023

Production: Detail – Order – Work in Process

You can branch to the report Production: Detail – Work in Process (0PC_C01_Q0023) from the query drilldown level order.