Start of Content Area

Workbook Production: Analysis – Work in Process  Locate the document in its SAP Library structure

Use

This workbook enables you to analyze the work in process and reserves for unrealized costs. Note that in this workbook, the WIP on the database is shown as a negative value, while in the report it is positive.

Caution

When you refresh a workbook in the BexAnalyzer, make sure the cursor is not positioned on a query. If the cursor is positioned on a query, only that query is refreshed.

For background information on the concept of workbooks, see Workbooks in Controlling

Structure

This workbook contains the following queries:

Technical Name of Query

Name and Short Description

InfoCube Use

0PC_C01_Q0009

Production: Analysis – Work in Process

0PC_C01 Cost Object Controlling: Transaction data for each product cost collector and order in Cost Object Controlling