Query Production: Detail – Order – Work in Process  Locate the document in its SAP Library structure

Technical name: 0PC_C01_Q0023

If you want to modify this query, note the special features of InfoCube 0PC_C01 Cost Object Controlling.

Use

This query is a hierarchical cost element report that shows the work in process and reserves for unrealized costs. The report can be expanded by fiscal year and period, or filtered.

Note

You can call up this query in different ways:

With selection of a cost element hierarchy:

If you select a cost element hierarchy when you call up this query, you cannot then expand the hierarchy by other characteristics (such as components or cost centers).

Without selection of a cost element hierarchy:

If you do not select a cost element hierarchy when you call up the query, the system displays a nonhierarchical cost element list that supports all navigation functions.

Note

This query is contained in the workbook Production: Detail – Order – Work in Process.

For background information on the concept of queries, see Queries in Controlling.

Filters

InfoObject

Description of the Info Object (and restriction or calculation formula)

0CO_AREA

Controlling area (variable &OP_COAR&, controlling area)

0CURTYPE

Currency type (fixed value 70, currency of controlling object)

0FISCVARNT

Fiscal year variant (SAP exit variable &OP_FVAEX&: the system derives the fiscal year variant from the controlling area)

User-Defined Characteristics

InfoObject

Description

0FISCPER

Fiscal year/period

0PRODORDER

Order (variable order &0S_ORD&)

Rows

Row Name

Description of the Info Object (and restriction or calculation formula)

0COSTELMNT

Cost element (hierarchy)

Columns

For information regarding work in process and reserves for unrealized costs, refer to the standard SAP Library under Controlling ® Product Cost Controlling ® Cost Object Controlling ® Period-End Closing ® Work in Process

Column Name

Description of the Info Object (and restriction or calculation formula)

WIP: Work in process

Set sign reversal for WIP in the report column

Reserves for unrealized costs

Reserves for unrealized costs