Show TOC

 Infinite Scheduling

Use

You can use this infinite scheduling mode to schedule or reschedule an operation directly on the desired date without considering the resource load. You can use this scheduling mode for both finite and infinite resources For more information on finite and infinite scheduling modes and resources, see Finite and Infinite Scheduling .

Features

If the desired date falls in a non-working time, the system automatically shifts the operation to the next possible date in the planning direction .

Note Note

A resource overload which can be displayed in the alert monitor for finite resources can result from the infinite scheduling of an operation. You must use a corresponding PP/DS alert profile for this purpose.

End of the note.