Copying Concept Data to the Component Variant
Use
Once the possible solutions (concepts) have been analyzed and checked by the responsible project team members, you can copy the data of the feasible concept to the component variant.
Data is determined as in the simulation, but when you copy, the concept data determined is saved for the component variant. The following overview shows which tab pages the data of a concept is copied to.
|
Data of Concept |
Data of Component Variant |
|
|
Basic Data 1 This data is entirely overwritten by the data of the concept. |
|
Before copying, you can select the documents that you want to be copied. |
Documents The documents that are copied from the concept are added to the existing document. |
Prerequisites
You have maintained the product structure in the iPPE Workbench:
See
See Creating an Access for a Concept

Before you copy the concept data to the component variant, we recommend that you
simulate the data transfer.Procedure
Start the iPPE workbench in change mode. Load the product structure in the navigation area.
Below the concept group, the active concept whose data is to be copied is displayed. If you want to check the detail data again, choose
(Detail View) for the concept.
You see a dialog box, in which you can confirm the data transfer.
You see a list of the documents that are relevant to the concept.
Result
The data of the concept is copied to the component variant. You can trace your changes in a log.
See
Displaying the Transfer Log