Processing the Testing Schedule
Use
In this procedure, you assign an inspection plan to each storage condition or item in the testing schedule.
Prerequisites
You have
created the testing schedule.Procedure
The initial screen for changing a stability study appears.
The screen for changing the stability study data appears.
A dialog box appears prompting you to indicate whether you want to edit the testing schedule and then return to stability study after editing.
The screen for changing the testing schedule appears.
Detailed information for the item is displayed.
A selection screen appears in which you can further limit which inspection plans are displayed.
A list of inspection plans meeting your selection criteria is displayed. These inspection plans have the same strategy assigned to them as the one assigned to this testing schedule. For each inspection plan in the list, the list also shows the operations with the assigned packages.
The data for selected inspection plan is copied into the appropriate fields of the Item tab.
The screen for changing the stability study appears.
Result
You have assigned an inspection plan to each storage condition. You can now
complete the testing schedule.