
Processing of Inspection Plans/Reference Operation Sets
Purpose
You use inspection plans to process a quality inspection in Quality Management (QM). You use reference operation sets as copy models.
Prerequisites
change master record
must have been created.
Process Flow
You can use an inspection plan or reference operation set as a copy model. The data in this copy model is copied into your inspection plan. You can change this data.
You can use an inspection plan or reference operation set as a copy model. The data in this copy model is copied into your reference operation set. You can change this data at any time. When you create an operation for a reference operation set, you cannot use a copy model. You must enter all data manually.

If task lists already exist for the same material or task list group in the system, once you access the function a screen appears, from which you can select the required inspection plan or reference operation set.
basic data at operation, characteristic level, (or both).

If you want to delete an inspection plan or reference operation set, in the task list overview, select the inspection plan or reference operation set to be deleted and choose Delete.