Entering content frameFunction documentationConsistency Check for Inspection Plans Locate the document in its SAP Library structure

Use

If you create or change an inspection plan, the system cannot automatically check all dependencies between:

As a result, when you are creating or editing an inspection plan, inconsistencies can occur. Such inconsistencies can in certain circumstances only be removed at a later date, once the production sequence is fixed. For this reason, you can specify when certain consistency checks are to be performed.

Prerequisites

In Customizing , the Cons. chk. consistency check indicator must be set in status management, if the inspection plan consistency is to be checked automatically before saving. If this indicator is not set, you can only carry out a consistency check if you call the corresponding function directly from the inspection planning functions.

Features

The system makes a consistency check for the entire task list group. The check is made not only for the key date, but for the entire validity period of the change status you have called up.

During the inspection plan check, the system checks the consistency of the following elements:

The system checks the consistency of the entire inspection plan, when you exit the inspection planning function or when you choose the consistency check pushbutton in inspection planning. Examples of inconsistencies:

Note

The system checks the consistency of an inspection plan from the key date that was specified on the initial screen. The system proposes the current date as a default value for the key date. If you want the consistency check to be carried out for a period of time prior to the current date, you must call the transaction again and change the key date accordingly.

The consistency of the inspection characteristics is checked automatically, when you exit the characteristic overview. This check takes place, irrespective of whether the consistency check indicator is set in Customizing. Examples of inconsistencies:

Examples of inconsistencies:

If the system finds inconsistencies, it displays information, warning or error messages in the message log. If the system displays a warning message, you can still save the plan without correcting the inconsistency. However, if it displays an error message, you must correct the inconsistencies before you can save the plan.

Activities

Automatic Consistency Check

Manual Consistency Check

 

 