Entering content frameProcess documentationProcessing of Operations Locate the document in its SAP Library structure

Purpose

You use operations to describe individual inspection steps in an inspection plan. You define the work center, at which the inspection takes place and the default values for the inspection. You can describe how the inspection is to take place in the text for the inspection operation.

In an inspection plan, the inspection operation is identified by a number. The sequence of inspection operation numbers determines the sequence, in which you process the inspection operations for an inspection plan. You define the increment for these inspection operation numbers in the Profile. You use the control key to define how an inspection operation in an inspection plan is to be managed.

Prerequisites

Process Flow

  1. You call up the operation overview for the inspection plan.
  2. You create the required inspection operations. You can then link to reference operation sets to simplify data entry.
  3. You can enter the following data:
  1. You assign one or more items of test equipment as Structure link production resources/tools (PRT), if you want to inspect with particular test equipment.
  2. You run a consistency check on the inspection plan.
  3. Save the data.

Note

You can delete an operation at any time.

The authorization for entering QM data at operation level is controlled by the authorization object for the characteristics contained in the task list.

Result

You have created an inspection plan with operations, to which you can assign Structure link inspection characteristics.

 

 