Entering content frameProcedure documentation Entering the Waste Origin Locate the document in its SAP Library structure

Use

To uniquely define the origin of a waste, it is frequently important to specify, along with the waste generator, the product or Structure link batch from which the waste was produced. You can therefore specify the original material and original batch in each entry document, in other words the material or the batch from which the waste was produced, for example as a result of production errors. You can also specify the external document that was issued for the original material, for example the number of the delivery note supplied by the vendor of the original material or the number of a production document.

Note

Prerequisites

You have executed the procedure Editing Entry Documents and are on the Disposal Processing Create or Disposal Processing Change screen.

Procedure

  1. In the entry documents for which you want to enter the waste origin, enter data as required in the following fields:

Field

Entry

Original mat.

Material from which the waste is produced

Orig.Batch

Batch from which the waste is produced

External doc.

External document that was issued for the original material

  1. Save your entries.
Leaving content frame