Set up control
data
In this work step, you define central settings
for engineering change management:
Effectivity
In the standard R/3
System, the effectivity of a change is determind by the
valid-from date.
You can also
activate parameter effectivity, and this define effectivity using
effectivity types.
The folowing
effectivity types are supported in the standrd R/3 System:
- SERNR (serial number interval)
You define whether
you can enter a
rank in the change master record (change header).
Revision
level
- By activating the
revision level you can indicate the different processing
statuses of materials and documents.
You can also make
the following additional settings:
- You can define an external
revision level number assignment for materials.
- You can define that a higher revision level
must always be assigned from the predefined revision level sequence. This
means that the new revision level always has the highest
value.
- You can define automatic
assignment for internal revision level assignment.
- If you want the revision levels to be assigned
in the predefined sequence, set the Extended sequence
check indicator.
Release
key
- Activate release
procedure
If you only want
changes to become effective after they have been released for successive work
areas (for example, production), set the
Release procedure active indicator. In the change master record
(change header), you define which areas the changes are to be taken into
account in using the
Release key .
You can use
the
- If required, set the follwoing
indicators:
Object management
record
- Display transaction goes to object
maintenance
This indicator is
only relevant to BOMs and documents.
You use this
indicator to allow you to change BOMs and documents from the object overview
(display mode of the change master record).
You use this
indicator to allow direct assignment to an object management record when
creating or changing an object.
Change
number
If change numbers
with alpha fields are also to be checked during external number assignment,
set the Number range check for alpha fields
indicator.
Date shift
- If the
Date shift indicator is set, the protected time interval can be
checked when a change master record or a change object is being
processed.
- You can determine whether the user receives a
warning or an error message.
The base date for
the check is the current date. The system calculates the warning or error time
that has been entered (in calendar days) from the current date. The key date
and all the days before it are counted in the protected time interval (see the
example for
warning time.
Note:
If you enter a negative value (for example, -10), the system calculates the
protected time interval in the past, starting from the
valid-from date.
- Warning time in days
Processing is allowed in this time interval. However, the system sends a
warning so that the change objects are checked.
- Error time in days
Processing is not allowed in this time interval.
You use this
indicator to control how messages are displayed when a date shift is
performed, and due to this date shift, the sequence of effectivity time
periods for BOMs and routings changes.
Standard
settings
Aktivitäten
Set the control data to meet your
requirements.