Show TOC
Date
shift
Definition
This indicator determines that the system
checks the protected time period when you process a change master record or
change object.
Use
If you process an object within the protected
time period, you see either a warning message or an error message.
The check is made in the following processing
situations:
- Processing a change master record
- Entering the valid-from date
- Entering an alternative date
- Shifting the valid-from date or alternative
date
- Allocating an alternative date to a change
object or deleting an allocation
- Processing a change object with reference to a
change number whose valid-from date is in the protected time
period
- Changing a change object (for example, BOM or
routing)
- Assigning or changing a revision
level
Dependencies
You can enter a number of calendar days in the
field Warn. time in days and/or Error
time in days. This number of days is then used to calculate the
period.