Interval of Available Capacity: Changing Shift Sequences

  1. In the Intervals of available capacity screen create a new interval of available capacity with the desired shift sequence and the same validity period as the original interval.
  2. The old interval of available capacity is overwritten by the new one

  3. If necessary, maintain the shifts