MRP with MRP Area 

Description

Up to now, material requirements planning had been carried out at plant level. The various requirements were combined in the planning run and procurement elements are created for them.

As of Release 4.5A, it is now possible to carry out material requirements planning separately for defined MRP areas. The implementation of MRP areas provides more clarity and allows you to differentiate to a greater extent within a plant when planning requirements.

The MRP area represents an organizational unit for which you can carry out material requirements planning independently. The results of the planning run are displayed specifically for each MRP area.

There are basically three types of MRP areas:

You can specifically plan dependent requirements and independent requirements, for example, for spare parts, for individual MRP areas.

In order to be able to plan independent requirements of a material, you can create a sales order with reference to a storage location, which belongs to an MRP area, or you can enter planned independent requirements specifying the MRP area in Demand Management.

In order to be able to implement MRP with MRP areas, you need to carry out the following IMG activities:

    1. In the IMG activity
    Convert planning file entries for MPR areas , you convert the existing planning file entries at plant level to planning file entries at MRP area level.
    2. In the IMG activity
    Activate MRP for MRP areas , you have to set the MRP area active indicator. This activates material requirements planning with MRP areas at client level. In addition, the MRP area field appears for selection in MRP applications.
    3. In the IMG activity Define MRP area , you create the MRP areas for every plant for which you would like to carry out material requirements planning separately.

You assign the materials to the various MRP areas in the material master by creating an MRP area segment for every MRP area in which the material is planned. You can define your own MRP parameters in the MRP area segment, such as, for example, the lot size or MRP type. This enables you to use different parameters for the material in each MRP area. If you have not entered any MRP areas in the material master, the material remains in the plant MRP area and is automatically planned in the plant MRP area.

The assignment of receipt and issue elements of a material to an MRP area is carried out in the planning run using storage location determination. The storage location determined controls the assignment to MRP areas. If the system cannot determine a storage location or if the storage location determined does not belong to an MRP area of the material, the system assigns the receipt and issue elements to the plant MRP area.

Dependent functions

Further notes

The following functions are available for MRP with MRP areas:

For more information on MRP areas, see the R/3 library documentation PP Material Requirements Planning in MRP Area.