Acceptance Inspection (Simplified) 
Purpose
In this process, you enter the inspection results and inspection activities recorded during inspection lot processing. You enter the following data.
We recommend that you go through this simplified process, before running the extensive version.
Prerequisites
This process does not require any data from other processes. It is a more detailed version of the QM in Procurement and Inventory Management process. You can execute the process step Execute inspection before the process step Incoming inspection if you want to procure material QS8X20 instead of material QS6X20.
Process Flow
You can find the data for this process under
.You create an inspection lot, on the basis of which you perform the acceptance inspection.
Performing the InspectionYou enter the results of the quality inspection for all operations and inspection characteristics. If inspection characteristics are rejected, the system automatically creates defect data records in the background. You can also enter the time required for the mechanical inspection.
Making the Usage DecisionYou enter the defects data and the time required for the visual inspection. You then make the usage decision.
Result
The inspection results are saved in the system.