System-Aided Resource Selection 

Use

If several resources can be used as the primary resource of an operation, you often cannot decide which resource you will actually use until shortly before production.

This function helps you make this decision as the system preselects suitable resources in the process order.
You maintain the criteria the system uses for this selection in the resource and master recipe. When you release an order, the system also uses these criteria to check whether you may use a resource.

Prerequisites

You have installed the application component Classification System (CA-CL).
Classes for alternative resources you can use have been created there. These classes meet the following requirements:

The master recipe only supports the date validity of engineering change management (see Engineering Change Management and Recipe Approval). For this reason, do not use classes or characteristic with parameter effectivity.

If you want to use system-aided resource selection for operations, assign a planning resource to these operations in the master recipe (see Assigning Primary Resources to Operations).

Features

When selecting resources, the system takes the following criteria into account:

You define the resource network during recipe editing in the recipe header (see Resource Network Assignment to Recipes).

You define them in the resource and in the operation of the recipe using the classification system (see below).

Resource selection using the classification system

For resource selection, you can use your own classes of class type 019 work center class. Using these classes, you specify the following in the master data:

You assign similar resources to the same class. You assign the individual resource attributes to the class characteristics.

You have defined the class charging vessel along with the class characteristics volume and stirring speed. You assign the resource master records of all available charging vessels to this class. In doing so, you enter the volume and stirring speed for each resource.

You enter resource selection conditions for the operations of your master recipes. In these conditions, you:

A mixture is to be created in operation 0010 of your master recipe. You enter a resource selection condition for this operation. In this condition, you assign the class charging vessel to the operation and determine the vessel volume required for the charge mixture as well as the stirring speed.

When you start resource selection in the process order, the system determines the resources that meet all operation requirements (see graphic below). Only these resources can be used when an order is released.

Resource selection in the process order

Activities

Editing Resource Selection Conditions