Editing Resource Selection Conditions 

Prerequisites

You have installed the application component Classification System (CA-CL).
Classes for alternative resources you can use have been created there. These classes meet the following requirements:

The master recipe only supports the date validity of engineering change management (see Engineering Change Management and Recipe Approval). For this reason, do not use classes or characteristic with parameter effectivity.

Procedure

  1. On the operation overview, select the operation for which you want to edit the resource selection condition.
  2. Choose .
  3. Enter the class of class type 019 (work center class) that is used to classify the resources to select from and choose .
  4. A list containing the class characteristics assigned to the resource class appears.

  5. Assign the resource characteristics required to carry out an operation as values to the class characteristics.