Object documentationDefine Chart Layouts

 

A chart layout contains the information for the structure and design of the various graphs. It determines which graphs are displayed and how they are arranged.

Chart elements must be integrated in chart layouts for Smart Chart to be able to display these in graphs. In Customizing, you can create any number of chart layouts for each institution.

You can use chart layouts, which you created in the i.s.h.med charting component, in Smart Chart also. In such cases, the system automatically transfers the days in advance from the old chart layouts.

Templates are available for each graph type.

The name of these templates starts with the special character "_". The templates are valid across clients.

Note Note

Note that the system only displays nursing graphs in the ward documentation work station.

End of the note.
Integration of Chart Elements

Choose +Chart Elements to select the desired elements from the list of available chart elements. To simultaneously select several chart elements for transfer, use the CTRL key. You can use the arrow keys to move the elements and thus control how they are aligned in the graph.

Definition of Period

In the chart layout you can define the following time information:

  • Definition of evaluation period

    Smart Chart automatically applies the start and end of the evaluation period from the case/period selection in the patient profile. You thus do not enter a period from which the system is to read the patient data when Smart Chart is called. You can enter a number of days in advance. This specification is used to display further days after the current day and enables, for example, planned procedures to be processed.

    Note Note

    If you are analyzing closed treatment cases that are in the past, the system ignores the entry for the days in advance.

    End of the note.
  • Definition of initial display period

    In the initial display period you specify which time section from the evaluation period the system should display when calling Smart Chart in the display area of the graphs and in the graph preview of the time bar navigation area.

Example Example

You can determine, for example, the current calendar week as the initial display period. If you admit the patient in the middle of the selected calendar week, the system will only display the days since the admission when selecting a case for this patient.

End of the example.

The selection criteria for the Smart Chart and the initial display period are defined in days. The smallest period which can be displayed is 0.25 days (corresponds to 6 hours).

Display periods can be a multiple of 6 hours, for example, 1.5 days.

Note Note

If the values are different to this, the system will automatically round up the entered value to the next highest valid value.

End of the note.
Display of Chart Layout in Smart Chart

The system displays the defined chart layouts in the Chart Layoutselection list as standard.

You can use the checkbox in Hide Selection List (Smart Chart) to define, for individual chart layouts, that the system should not display these chart layouts in the Chart Layout selection list.

Recommendation Recommendation

We recommend that you do not hide standard chart layouts, as this can lead to error messages.

End of the recommendation.

More Information

For more information on defining standard chart layouts, see Standard Chart Layout.

You can find further information on managing chart layouts under Managing Chart Layouts.

You can find information on case/time period selection under Start of the navigation path SAP Healthcare - Industry-Specific Component Clinical System Next navigation step Smart UI Next navigation step Patient Profile Next navigation step Patient Record Next navigation step Period Selections for Patient Record End of the navigation path.

For more information on chart elements, see Chart Elements.