Master Cost Center (Relationship 011)
The assignment of a cost center to update costs that are incurred for the organizational object.
By assigning a master cost center to an organizational object, you specify that the costs that are incurred for this organizational object are to be posted to the assigned cost center. If an organizational object does not have its own assignment to a cost center, the system passes on the cost center responsibility from the higher-level organizational object.
When assigning a cost center, the system ensures that only those cost centers that are permitted according to the data in the infotype Account Assignment Features can be assigned. The system also checks whether the assignment is permitted according to the data of those employees also assigned to the structure (Organizational Assignment infotype).
You have the following editing options:
Create
Choose New
to create a new data record. Since only one data record may exist for an object at a time, the system adjusts the validity periods of other existing data records as required. The system allows time gaps between individual data records.
Edit
Choose Edit
to change the data of an existing data record.
You can change the content of the data record by adjusting the existing data and leaving the validity period of this data record unchanged.
You can change the validity period of a data record. As a result, the system adjusts the validity periods of other existing data records, or automatically creates additional data records to close time gaps. However, since the system allows time gaps between individual data records, you can delete unwanted data records.
Delete
Since the system allows time gaps between individual data records, you can delete unwanted data records. To do so, choose Delete
.
The system stores the data for this data area in the Relationships
infotype (database table HRP1001
). The following fields are available:
Field | Description | Data Storage |
| Validity period of data | Infotype |
| Assigned cost center | |
| Controlling area of assigned cost center | The system uses the assigned cost center to determine this |