Log Message: com.sap.SCC.core_client.000034

Message (WARNING)

Syntax

The validity period of the newly created allowance is postponed by the system for the allowance plan [{allowancePlanId}] with the subscriber account [{suacId}] and the provider contract [{contractId}] because an allowance cannot be renewed more than once per day.

Legend
{suacId}:
The subscriber account ID
{contractId}:
The contract ID
{allowancePlanId}:
The allowance plan ID

Severity

Warning

Detailed Information (APPS_COMMON Log)

The system postpones the validity period of the new allowance to the validity start date of the expired allowance plus 1 day (Gregorian Calendar).

Possible Impacts

If the validity period of the expired allowance is lower than 1 day, a time interval can separate the 2 allowances.

Next Steps (Troubleshooting)

This section provides you with some troubleshooting operations to identify the correction actions to be performed. In a production system landscape, contact your SAP Support Team for each fatal error message in the logs.

  • To avoid discontinuities in the allowance chronology, modify the allowance logic to ensure that the validity period is greater than or equal to 1 day.
  • Archive the log and trace messages.

SAP User Experience

Enrich your SAP user experience and join our community:

Recommendation

SAP provides you with the SAP Community Network (SCN) platform. You can benefit from a wide range of technical and business guidance from a community of experts and share knowledge and your best practices.

Share your symptoms or step-by-step resolutions to a wide range of problems that may occur in your work with SAP Convergent Charging.