Error Code: CONTRACT-28

Message

Syntax

Impossible to modify the linked contract because the parent contract ID {specifiedchargingContractId} specified in the operation request does not correspond to the parent contract ID {realchargingContractId} which already exists in the linked contract.

Legend
  • {specifiedchargingContractId}: The provider contract ID specified in the operation
  • {realchargingContractId}: The provider contract ID which already exists in the linked provider contract

The meaning of this error cause message depends on the software layers and internal architecture of the SAP CC systems. See the note to adapt the terminology to the concepts and data models you work with.

Next Actions and Steps (Troubleshooting)

Change the provider contract ID to the existing one {1}.

Verify your changes.

Additional Information

Consider the specifications of the appropriate technical interfaces: Web Services, HTTP Communication Interface (HCI), or Message TCP.

Validity

This error code is valid from SAP CC version number 4.0 SP00 to the software version that this documentation refers to. For newer versions, consult the relevant documentation.