Minimum/Maximum Amount Check for Clearing Amount

When you check reconnection criteria in event R720, you can also execute a max/min. amount check. This enables you to check the clearing amount of disconnection items in one contract and in all contracts in a contract account . If clearing the disconnection-relevant items fulfills the minimum/maximum amount specified, the criteria for reconnecting the installation allocated to a contract are also fulfilled. The standard specification is that the maximum/minimum amount during clearing must correspond to 100% of the total amount of the dunned items.

Note Note

If you want to specify a lower value, you can maintain this in event R720.

End of the note.

Table TA_FKKCL contains all items responsible for the disconnection of an installation. This provides you with the freedom to specify whether the total amount of cleared items during clearing is enough to trigger the reconnection of an installation.