Yard Task - Items
Use
Prerequisites
You have defined the TU types and how a TU type is used in yard processes in Customizing for Define Transportation Unit Types under .
Features
-
You can maintain the child to parent relationship between items.
-
You can assign an icon type to a TU type in Customizing. The system displays this icon against an item associated with this TU type. Else, the system displays a default icon for the item.
-
Activity Category of a yard task influences the yard item input behavior. The system determines the scenario that is executed based on the value of this field.
-
You can only create non-grouping items from a yard task. A yard task can use the grouping items created through a yard request or a yard order. For more on grouping items, see Yard Order - Items.
Non-grouping Items
These are physical objects in the yard. Non-grouping items can be of the following types:-
Carrying items: Other items can be loaded on to these items. Mostly, such items are movable, actively or passively, for example, trucks, trailers, locomotives, rail cars.
-
Loading items: Items that can be loaded on top of other items, for example, containers. The most complex case for yard order creation are piggyback transports. For example, trucks that enter a yard and then are loaded onto railcars. Here, the truck is a carrying item but is also a loading item when it is loaded onto the rail car.
-
-
You can view the Source Parent TU, Destination Parent TU and Transportation Unit if they are assigned to the yard task item. To do so, select the item row and then select the TU Details button. Choose the TU document that you want to display.
-
You can implement the Business Add-in /SAPYL/YT_LOAD_SCHEME to enhance the determination and validation of the loading scheme before saving of the yard task. You can implement this BAdI in Customizing for BAdI: Yard Task Loading Scheme Enhancement (Determination + Validation) under .
Activities
-
Go to the yard task.
-
Select the Items option.
-
Select New.
-
Enter the relevant information for the item.
-
Create a subitem for an item, if required. To create a subitem:
-
Select an item. Then choose .
-
Enter the relevant information for the subitem and save your entries.
-
Go to the yard task.
-
Select the Add Group option.
-
Enter the relevant information for the item and subitems.

