Stacking of Transportation Units on Storage Bins

Use

Use this function to check the stacking and unstacking of transportation units (TUs) on storage bins. When you are creating, activating or confirming a yard task for stacking or unstacking, the system executes some checks. Only if these checks are successful, the system creates, activates or confirms the yard task.

TUs on stackable bins are managed the same as on non-stackable bins using predecessor / successor TU references. A stackable bin can be managed sorted or unsorted. A yard task for a stackable bin is a movement activity. See Assign Visual Object Type to Storage Bin Type. You can move TUs out of the stack even if they are not on top of the stack. Using predecessor/successor option in a yard task, you can move a TU into the middle of the stack. On a stackable bin, predecessor means the TU below the current TU and successor means the TU above the current TU. See Sections of a Yard Task.

Checks while creating a yard task

  • The system checks that only one TU (without a hierarchy) is placed at a stack level with one yard task.

  • The system checks whether the TU is stackable or not. You have maintained the TU Stackable indicator for a TU type in Customizing for Define Transportation Unit Types under Start of the navigation pathSAP Customizing Implementation Guide Next navigation step Yard Logistics Next navigation step Master Data Next navigation step Settings for Transportation Units Next navigation step General SettingsEnd of the navigation path.

Checks while activating or confirming a yard task

If any of these checks are unsuccessful, the system gives an error and the yard task does not get activated.

  • The system checks the maximum level of stacking for a storage bin type. You have maintained the maximum level of stacking for a storage bin type in Customizing for Define Stacking Storage Bin Types under Start of the navigation pathSAP Customizing Implementation Guide Next navigation step Yard Logistics Next navigation step Master Data Next navigation step Setting up the Yard Next navigation step Yard StructureEnd of the navigation path.

  • The system checks the stacking relation between two TU types, that is, the whether a TU type can be above another TU type. You have maintained the stacking relation between two TU types in Customizing for Define Stacking Relations under Start of the navigation pathSAP Customizing Implementation Guide Next navigation step Yard Logistics Next navigation step Master Data Next navigation step Settings for Transportation Units Next navigation step Loading and StackingEnd of the navigation path.

  • The system checks whether the maximum stackable weight that it can take. You have maintained the Max Stackable Weight for a TU type in Customizing for Define Transportation Unit Types under Start of the navigation pathSAP Customizing Implementation Guide Next navigation step Yard Logistics Next navigation step Master Data Next navigation step Settings for Transportation Units Next navigation step General SettingsEnd of the navigation path.

Only if these checks are successful, the customized TUs can be stacked according to the stacking relations on the marked bin.

Activities

The possible activities are:

  • Move-ins, that is, put TU on the bin or stack – A Moving yard task with exactly one TU (yard task item) to the bin (destination)

  • Move-outs, that is, take the TU from the bin or stack – A Moving yard task with exactly one TU (yard task item) from the bin (source)