Example of ELS with a Work Step Sequence
Scenario
You are a warehouse manager and you have created a warehouse order with multiple warehouse tasks. One of the warehouse workers must fetch two toys and a cardboard box for packaging. The calculation of the planned time must consider the following:
-
Individual withdrawal processes
-
Travel distances
-
Constant time for reading the warehouse order
The following must apply for the calculation:
-
The planned time of the warehouse order corresponds to the sum of the planned times of the warehouse tasks + travel time + constant.
-
The planned time of a warehouse task must be independent of the product group (for example, toy, packaging).
-
For a withdrawal process, the steps turn, take, and put on resource apply, whose times are partially constant. The step take depends on the weight.
Settings for the Warehouse Order
You make the following settings for the warehouse order:
-
Create a formula containing a sum with the following addends:
-
Planned time of workload (to use the planned times of the warehouse tasks)
-
Travel time
-
-
Define the two work steps:
-
Read Document: with a constant for the time calculation, for example, 1 minute.
-
Execute Labor Tasks: with the previously defined formula for the time calculation.
-
-
Define a work step sequence, consisting of the two work steps.
-
Assign the work step sequence to the following objects:
-
Warehouse number
-
External process step
-
Activity area
-
Object type Warehouse Order for Warehouse Tasks
-
Settings for the Warehouse Task
You make the following settings for the warehouse task:
-
Define a formula for the planned time calculation of work step Take as a product of the weight and a constant, such as 1 kg corresponds to 1 minute of planned time.
-
Define a condition using the given product group Toy.
-
Define the work steps:
-
Turn: with a constant for the time calculation, such as 5 seconds.
-
Take is defined for the toys using the formula for the time calculation, and for the packaging using a constant. The defined condition controls the different calculation.
-
Put on resource: with a constant for the time calculation, such as 10 seconds.
-
-
Define a work step sequence, consisting of the three work steps.
-
Assign the work step sequence to the following objects:
-
Warehouse number
-
External process step
-
Activity area
-
Object type Warehouse Task
-
Result
The calculation for a warehouse order with three warehouse tasks (toy weighing 1 kg, toy weighing 2 kg, and a box) would be the following, assuming a constant time to read the document of 1 minute and a travel time of 6 minutes:
Warehouse Task 1: 5 s + 1*1 min + 10 s = 1 minute 15 seconds
Warehouse Task 2: 5 s + 2*1 min + 10 s = 2 minutes 15 seconds
Warehouse Task 3: 5 s + 1 min + 10 s = 1 minute 15 seconds
Warehouse Order: 1 min + 6 min + 1 min 15 s + 2 min 15 s + 1 min 15 s = 11 minutes 45 seconds