PSM: Cost Center (Range): Plan/Actual - Situation Technical name: 0CCA_C11_Q0360
If you want to modify this query, note the special features of the InfoCube 0CCA_C11 CO-OM-CCA: Costs and Allocations .
This query is a regular report for the area manager. It provides an overview of the following costs incurred in a cost center range:
Actual and planned costs for each of the previous periods with respective variances
Actual and planned costs cumulated up to the current period with respective variances
Actual costs projected for the whole year, and the total planned costs with respective variance
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
InfoObject |
Description of InfoObject |
|---|---|
0COSTELEMNT |
Cost element (variable 0N_COEL, 0H_COEL) |
0FM_AREA |
|
0FUND |
|
0FUNC_AREA |
|
0GRANT_NBR |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
0COSTCENTER |
Cost center (variable 0N_CCTR, 0H_CCTR) |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
Previous period and cumulated up to current period (Use of the Situation in Current Period structure) |
Values from the previous period and the cumulated values up to the current period |
Actual |
Actual costs in current fiscal year |
Plan |
Planned costs in current fiscal year |
Variance (%) |
Percentage variance between actual and planned costs in the current fiscal year (actual - plan) / plan |
Actual projection |
Projection of actual costs for the entire year, based on the actual costs cumulated up to the current period of the current fiscal year |
Planned costs |
Planned costs from all periods in the current fiscal year |
Variance (%) |
Percentage variance between projected actual costs and planned costs (actual - plan) / plan |
The
Planned costs, actual costs
and
variance
key figures are always displayed for the previous period and displayed as cumulated up to the current period of the current fiscal year.
See also: