PSM: Cost Center (Detail): Actual/Plan - Situation Technical name: 0CCA_C11_Q0302
If you want to modify this query, note the special features of the InfoCube 0CCA_C11 CO-OM-CCA: Costs and Allocations .
This query is a regular report for the cost center manager. It provides an overview by cost element of the actual and planned costs incurred on a cost center for the current fiscal year, cumulated up to the current fiscal year, and projected based on the cumulated actual costs.
For background information on the concept of queries, see Queries in Controlling .
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
0CO_AREA |
Controlling area (variable 0P_COAR; single value entry, required) |
0CURTYPE |
Currency type (fixed value 10, company code currency) |
0FISCVARNT |
|
0COSTCENTER |
Cost center (optional entry, variable 0S_CCTR) |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
0FM_AREA |
|
0FUND |
|
0FUNC_AREA |
|
0GRANT_NBR |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
0COSTELEMNT |
InfoObject |
Description of InfoObject (or Restrictions or Calculation Formula) |
|---|---|
Previous period and cumulated up to current period (Use of the Situation in Current Period structure) |
Values from the previous period and the cumulated values up to the current period |
Actual |
Actual costs |
Plan |
Planned costs |
Variance (%) |
Percentage variance between actual costs and planned costs (actual - plan) / plan |
Projection |
Projection of actual costs for the entire year, based on the actual costs cumulated up to the current period of the current fiscal year |
Planned costs |
Planned costs |
Variance (%) |
Percentage variance between the projected actual costs and planned costs (actual - plan) / plan |
The key figures
planned costs, actual costs
and
variance
are always displayed for the previous period and displayed as cumulated up to the current period of the current fiscal year.
See also: